Costa Rica Mission Trip

Picture Gallery

Here’s a few pictures.

July 21, 2011 Posted by | Costa Rica 2011, Uncategorized | Leave a Comment

Mucho Trabajo

For the last three days we have been pretty busy. We worked on metal tubing that we have to clean and paint. Then they arewelded together to make frames for the second floor above the old sanctuary.

There is a second crew inside the old sanctuary working on a new wall and putting in new counter tops for the kitchen. The third crew is working on top of the old sanctuary where they are installing the framing for the new building.

Today we also had two of the frames mounted on the second floor. It’s very big, very heavy and very high.

The team is doing very well, we have all bonded together. We are from four different cities in three different states. Pictures are being uploaded but will take a couple hours. I will post a link when they are finished.

July 21, 2011 Posted by | Costa Rica 2011, Uncategorized | Leave a Comment

   

Follow

Get every new post delivered to your Inbox.